See Real Estimates Before You Commit

Download actual sample estimates and takeoffs from our team. Real format, real line items, real marked-up drawings. No sign-up required.

4200+
Projects Completed
96%
Accuracy Rate
10-38hrs
Typical Turnaround
AllCSI
Trades Covered
Sample Estimates

Download and See What You're Getting

Real estimates from our team, same format and level of detail you'd get on a paid project. Pick a trade, open the PDF, and judge for yourself.

landscape
Division 31 — Earthwork

Sitework & Earthwork Estimate

picture_as_pdf PDF Sample

Excavation, grading, soil disposal, and site prep for a mid-size commercial project. Cut-and-fill calculations and unit pricing per cubic metre, with quantities traceable to the plans.

corporate_fareProject type: Commercial
picture_as_pdfTakeoff sheets, cost breakdown, marked-up drawings
foundation
Division 03 — Concrete

Concrete Estimate & Formwork Takeoff

picture_as_pdf PDF Sample

Footings, slabs, columns, and walls with formwork quantities. Material volumes in cubic metres, rebar schedules, and pour-sequencing notes so your super knows what's coming.

homeProject type: Residential & Commercial
picture_as_pdfTakeoff sheets, cost breakdown, marked-up drawings
layers
Division 04 — Masonry

Masonry Estimate

picture_as_pdf PDF Sample

Block count, brick quantities, mortar volumes, and lintel schedules for a commercial masonry scope. Unit pricing referenced to current Canadian market rates, broken out by wall type.

corporate_fareProject type: Commercial
picture_as_pdfTakeoff sheets, cost breakdown, marked-up drawings
construction
Division 05 — Metals

Structural Steel & Metals Estimate

picture_as_pdf PDF Sample

Wide-flange beams, columns, connection plates, and miscellaneous metals for an industrial structure. Weight-based takeoff with current steel pricing per tonne, no guessing involved.

factoryProject type: Industrial
picture_as_pdfTakeoff sheets, cost breakdown, marked-up drawings
construction
Division 03 / 05 — Concrete & Metals

Rebar Takeoff & Estimate

picture_as_pdf PDF Sample

Rebar schedule by bar size and length, lap splice calculations, and total weight by zone for a concrete foundation package. Priced per kilogram with placement labour split out.

homeProject type: Residential Foundation
picture_as_pdfRebar schedule, cost breakdown, marked-up drawings
handyman
Division 06 — Wood & Plastics

Lumber & Wood Framing Estimate

picture_as_pdf PDF Sample

Stud count, header schedules, sheathing quantities, and engineered lumber for a wood-frame residential build. Board footage and linear metre counts with current lumber pricing from Canadian suppliers.

homeProject type: Residential
picture_as_pdfTakeoff sheets, cost breakdown, marked-up drawings
roofing
Division 07 — Thermal & Moisture
picture_as_pdf PDF Sample

Flat and sloped roof areas, membrane quantities, insulation board, flashing, and fastener counts. Priced per square metre with material and labour split by zone, not lumped together.

corporate_fareProject type: Commercial
picture_as_pdfTakeoff sheets, cost breakdown, marked-up drawings
layers
Division 07 — Thermal & Moisture

Insulation Estimate

picture_as_pdf PDF Sample

Batt, blown, and rigid board insulation for wall, ceiling, and below-grade applications. RSI values noted per zone, quantities calculated separately so you can price material and labour on their own.

homeProject type: Residential
picture_as_pdfTakeoff sheets, cost breakdown, marked-up drawings
window
Division 09 — Finishes

Drywall Takeoff & Estimate

picture_as_pdf PDF Sample

Board counts, joint compound, tape, and fasteners for a multi-room commercial fit-out. Ceiling and wall areas broken out by board type, with metal stud framing quantities on the same sheet.

corporate_fareProject type: Commercial Fit-out
picture_as_pdfTakeoff sheets, cost breakdown, marked-up drawings
layers
Division 09 — Finishes

Flooring Estimate

picture_as_pdf PDF Sample

LVT, carpet tile, polished concrete, and ceramic tile areas by room. Substrate prep, adhesive, transition strips, and waste allowances per finish type, all priced separately.

corporate_fareProject type: Commercial
picture_as_pdfTakeoff sheets, cost breakdown, marked-up drawings
format_paint
Division 09 — Finishes

Painting Estimate

picture_as_pdf PDF Sample

Interior and exterior paint quantities by surface type, primer coats, and finish coats. Coverage rates calculated per coat, material and labour shown on separate lines so you can adjust either independently.

homeProject type: Residential
picture_as_pdfTakeoff sheets, cost breakdown, marked-up drawings
water_drop
Division 22 — Plumbing

Plumbing Estimate

picture_as_pdf PDF Sample

Fixture counts, pipe linear metres by diameter and material, fittings, valves, and rough-in labour for a multi-storey residential building. Takeoff done in FastPIPE so every spool is accounted for.

homeProject type: Multi-storey Residential
picture_as_pdfPipe schedule, cost breakdown, marked-up drawings
hvac
Division 23 — HVAC

HVAC & Mechanical Estimate

picture_as_pdf PDF Sample

Ductwork quantities, equipment schedules, diffuser counts, and insulation for a commercial HVAC scope. Done in FastDUCT with material and labour split by system zone so each floor stands on its own.

corporate_fareProject type: Commercial Office
picture_as_pdfDuct schedule, cost breakdown, marked-up drawings
bolt
Division 26 — Electrical

Electrical Estimate

schedule Coming Soon

Panel schedules, conduit runs, wire quantities, fixture counts, and device schedules. Sample being added shortly. We estimate electrical now.

corporate_fareProject type: Commercial
scheduleSample file coming soon
engineering
Divisions 22 / 23 / 26 — MEP

Full MEP Estimate Package

picture_as_pdf PDF Sample

Mechanical, electrical, and plumbing combined for a mid-size commercial project. Trade-by-trade summaries plus a single rolled-up total, so your GC and subs can each read their own section without digging through the whole document.

corporate_fareProject type: Commercial
picture_as_pdfMEP schedules, cost breakdown, marked-up drawings
What Every Sample Includes

The Same Package You'd Get on a Real Project

What you download here is the actual format our estimators use. Nothing added for show, nothing stripped out to hide the detail.

calculate

Itemised Cost Breakdown

Every line item listed with material quantities, unit costs, and labour hours. You can check every number against the drawings.

description

Marked-Up Drawings

Colour-coded takeoff markups showing exactly what was measured and where. Nothing gets counted without a mark on the plan.

verified

Assumptions & Exclusions

Every scope gap or assumption is logged. You know exactly what's in, what's out, and where we made a call on missing info.

layers

CSI MasterFormat Structure

Organised by CSI division so your project manager, GC, and subs all read it the same way. No reformatting needed.

FAQ

Questions About the Samples

If you want to see something specific that's not here, send us your plans and we'll get you a real quote in 15 to 20 minutes.

Real estimates. We've anonymised the client and project name, but the quantities, line items, and marked drawings are unchanged. What you see is what you'd get on a paid project.

No. Click the download button and the PDF opens. No form, no email, no follow-up sequence. That's it.

We're adding samples for every major CSI trade. In the meantime, reach out and we'll send you a relevant sample directly, or just get a real quote for your project. We cover all CSI trades.

Same format. Content will match your drawings, your trades, and your scope. The structure, marked-up drawings, and assumptions log are standard across every project we do.

Send your plans to plans@constructionestimating.ca or fill in the quote form. You'll hear back in 15 to 20 minutes during business hours, Monday to Friday, 8 AM to 6 PM MST.

Ready to Start?

Send Us Your Plans and We'll Handle the Rest

Pricing from $100 CAD, quote back in 15 minutes, estimate in your hands within 10 to 38 hours. No contracts.

check_circleFrom $100 CAD Per Project check_circleNo Contracts or Retainers check_circleAll CSI Trades Covered check_circle96% Accuracy Rate